A precast wall goes up quickly, but the few hours spent on marking and pillar setting decide how straight it will be for years.
1. Marking
The boundary line is agreed with the owner and marked with a string. Corners, gates and any slope are marked before digging.
2. Pillar pits
Pits are dug every 6 ft, about 1.5 to 2 ft deep. Corner and end pillars go in first.
3. Setting pillars
Each pillar is placed in the pit, checked with a spirit level and lined up with the string, then the pit is filled with PCC. The PCC is left to set before panels go in.
4. Panels
Panels are lowered into the grooves from the top, one above the other, until the wall reaches its height.
5. Finishing and handover
Gaps at the bottom are filled, extra soil is levelled and the site is cleaned. Barbed wire, Y angles or paint are added if ordered. The owner walks the wall with our supervisor before the bill is made.
What the owner should check
- Pillars standing straight when you look along the line
- PCC around every pillar, not just soil
- All panels fully down in the grooves
- Broken or chipped pieces replaced
This article is general guidance. Site conditions and your own engineer’s advice come first.